High-level WBS

Create a high-level WBS comprised of at least three levels:• Each level should have with a minimum of five level 1 tasks, with two level 2tasks, and three (3) Level 3 tasks.• Describe each task (work package) in your WBS with just enough information sothat everyone in the team can understand what each work package means.• Level Numbering:o Your first level of tasks should be numbered 1.0, 2.0, 3.0, 4.0, and 5.0.o Your second level of tasks should be numbered 1.1, 1.2, 2.1, 2.2, etc.,o The third level of tasks should be numbered 1.1.1, 1.1.2, 1.1.3, 1.2.1,1.2.2. 1.2.3 etc.